logo

Townsite Solar 2 Data Center Project

Sector: Biomass • Location: Boulder City, Nevada, United States

Source: The Nevada Independent

Project
Approved By Blm, Under Appeal

A data center project initially proposed on city-owned land in Boulder City, Nevada, later shifted to nearby federal land approved by the U.S. Bureau of Land Management. The project includes a data center spanning millions of square feet, a 70 MW battery storage facility, and backup biodiesel or natural gas generators. It is expected to have a peak demand of 167 MW and use electricity from a nearb

Status
Approved by blm, under appeal
Sector
Biomass, Solar, Power Generation (CCGT), Natural Gas, Data Center, Energy Storage
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
The Nevada Independent

ConstructChat

Ask ConstructChat about Townsite Solar 2 Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Townsite Solar 2 Data Center Project” is an infrastructure initiative in the Biomass sector, located in Boulder City, Nevada, United States. Taiyo aggregates data on it from The Nevada Independent.

Participants

Not available for this record.

Status

Original status

approved by blm, under appeal

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A data center project initially proposed on city-owned land in Boulder City, Nevada, later shifted to nearby federal land approved by the U.S. Bureau of Land Management. The project includes a data center spanning millions of square feet, a 70 MW battery storage facility, and backup biodiesel or natural gas generators. It is expected to have a peak demand of 167 MW and use electricity from a nearby substation with a portion from renewable sources.

Original sector

Energy

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

The Nevada Independent

URL

More Details

Record type

Project

Sector

Biomass, Solar, Power Generation (CCGT), Natural Gas, Data Center, Energy Storage

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project