logo

Townsite Solar 2 Data Center Project

Sector: Solar • Location: Boulder City, Nevada, United States

Source: KTNV

Project
Planned

A data center project proposed by Townsite Solar 2 on an 80-acre parcel of federal land in Eldorado Valley, within Boulder City's jurisdiction. The project is a pivot from an earlier 2023 proposal for a 19 megawatt solar facility and battery storage site. The data center would use up to 167 megawatts of power demand and include backup generators. The project has faced local opposition due to conce

Status
Prospective
Sector
Solar, Energy Storage, Power Generation (CCGT), Data Center, Raw Materials
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
KTNV

ConstructChat

Ask ConstructChat about Townsite Solar 2 Data Center Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Townsite Solar 2 Data Center Project” is an infrastructure initiative in the Solar sector, located in Boulder City, Nevada, United States. Taiyo aggregates data on it from KTNV.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A data center project proposed by Townsite Solar 2 on an 80-acre parcel of federal land in Eldorado Valley, within Boulder City's jurisdiction. The project is a pivot from an earlier 2023 proposal for a 19 megawatt solar facility and battery storage site. The data center would use up to 167 megawatts of power demand and include backup generators. The project has faced local opposition due to concerns about environmental review and land use approval processes.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

KTNV

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT), Data Center, Raw Materials

Article published date

2026-07-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project