logo

Townsite Solar 2 Data Center

Sector: Solar • Location: Boulder City, Nevada, United States

Source: FOX5 Vegas

Project
Planned

The Townsite Solar 2 data center is a proposed project to build a large data center on 88 acres of open desert west of the 95 and south of I-11 in Boulder City, Nevada. The project has raised concerns among residents about environmental impact, heat generation, and increased power and water bills. The project was discussed by the Boulder City Council as a way to close a budget gap and has passed a

Status
Prospective
Sector
Solar, Water Supply and Storage, Data Center, Power Generation (CCGT)
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
FOX5 Vegas

ConstructChat

Ask ConstructChat about Townsite Solar 2 Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Townsite Solar 2 Data Center” is an infrastructure initiative in the Solar sector, located in Boulder City, Nevada, United States. Taiyo aggregates data on it from FOX5 Vegas.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Townsite Solar 2 data center is a proposed project to build a large data center on 88 acres of open desert west of the 95 and south of I-11 in Boulder City, Nevada. The project has raised concerns among residents about environmental impact, heat generation, and increased power and water bills. The project was discussed by the Boulder City Council as a way to close a budget gap and has passed an initial phase, moving on to the Planning Commission for further consideration.

Original sector

Technology Infrastructure

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

FOX5 Vegas

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Data Center, Power Generation (CCGT)

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project