logo

Townsite Solar 2 Project

Sector: Commercial • Location: Boulder City, Nevada, United States of America

Source: Dodge USA

Project
Planning Schematics

19 megawatts (MW) of power generation capacity to the power grid, and is expected to include battery storage capable of storing 35MW of power

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Residential, Energy Storage, Solar
Location
Boulder City, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Townsite Solar 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Townsite Solar 2 Project” is an infrastructure initiative in the Commercial sector, located in Boulder City, Nevada, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

19 megawatts (MW) of power generation capacity to the power grid, and is expected to include battery storage capable of storing 35MW of power

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Boulder City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Residential, Energy Storage, Solar

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project