logo

Tozeur 50 MW Solar Plant

Sector: Power Generation (CCGT) • Location: Tozeur, Tunisia

Source: ZAWYA

Project
Commissioning

A 50 MW solar plant in Tozeur, Tunisia, with commissioning trials started in December 2025 and full commissioning expected by year-end.

Status
Under Construction
Sector
Power Generation (CCGT), Solar
Location
Tozeur, Tunisia
Updated
22 Jul 2026
Source
ZAWYA

ConstructChat

Ask ConstructChat about Tozeur 50 MW Solar Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tozeur 50 MW Solar Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tozeur, Tozeur, Tunisia. Taiyo aggregates data on it from ZAWYA.

Participants

Not available for this record.

Status

Original status

commissioning

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 50 MW solar plant in Tozeur, Tunisia, with commissioning trials started in December 2025 and full commissioning expected by year-end.

Original sector

Energy

Location

Country

Tunisia

State

Tozeur

City

Tozeur

Source

Source

ZAWYA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-12-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project