Tracadie - Principale St. Infrastructure - Phase 2A
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration proble
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration problem and to avoid annual water main breaks. The scope of work will include: - Replacing 330 metres of existing and adding 230 metres of new concrete-asbestos sanitary sewer mains with polyvinyl chloride (PVC) lines - Replacing 330 metres of existing and adding 230 metres of new iron pipe water mains with PVC lines - Replacing 330 metres of existing concrete storm sewers with high-density polyethylene pipe and concrete pipe - One new wastewater pump station - Reinstating the road along the 0.33km area of work, with the addition of active transportation concepts such as a bike path. The streetlights will be upgraded to LED, along with a 435m section from Phase 1. This project is Phase 2A of a four phase project to replace the critical infrastructure on Principale Steet. The project aims to help ensure the community has access to reliable potable water, and can better manage wastewater and storm water in an environmentally sustainable manner. As well as being able to use active transportation to safely commute through the downtown area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
