logo

Tracadie - Principale St. Infrastructure - Phase 2A

Sector: Water Supply and Storage • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration proble

Status
Closed
Sector
Water Supply and Storage, Metal, Cement, Waste Processing and Treatment, Chemical (Industrial), Road, Manufacturing (Industrial)
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Tracadie - Principale St. Infrastructure - Phase 2A

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Tracadie - Principale St. Infrastructure - Phase 2A” is an infrastructure initiative in the Water Supply and Storage sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration problem and to avoid annual water main breaks. The scope of work will include: - Replacing 330 metres of existing and adding 230 metres of new concrete-asbestos sanitary sewer mains with polyvinyl chloride (PVC) lines - Replacing 330 metres of existing and adding 230 metres of new iron pipe water mains with PVC lines - Replacing 330 metres of existing concrete storm sewers with high-density polyethylene pipe and concrete pipe - One new wastewater pump station - Reinstating the road along the 0.33km area of work, with the addition of active transportation concepts such as a bike path. The streetlights will be upgraded to LED, along with a 435m section from Phase 1. This project is Phase 2A of a four phase project to replace the critical infrastructure on Principale Steet. The project aims to help ensure the community has access to reliable potable water, and can better manage wastewater and storm water in an environmentally sustainable manner. As well as being able to use active transportation to safely commute through the downtown area.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Cement, Waste Processing and Treatment, Chemical (Industrial), Road, Manufacturing (Industrial)

Article published date

2026-04-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project