Tracadie - Principale St. Infrastructure - Phase 2A
Sector: Water Supply and Storage • Location: New Brunswick, Canada
Source: Infrastructure Canada
This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration proble
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Cement, Waste Processing and Treatment, Chemical (Industrial), Road, Manufacturing (Industrial)
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Tracadie - Principale St. Infrastructure - Phase 2A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration problem and to avoid annual water main breaks. The scope of work will include: - Replacing 330 metres of existing and adding 230 metres of new concrete-asbestos sanitary sewer mains with polyvinyl chloride (PVC) lines - Replacing 330 metres of existing and adding 230 metres of new iron pipe water mains with PVC lines - Replacing 330 metres of existing concrete storm sewers with high-density polyethylene pipe and concrete pipe - One new wastewater pump station - Reinstating the road along the 0.33km area of work, with the addition of active transportation concepts such as a bike path. The streetlights will be upgraded to LED, along with a 435m section from Phase 1. This project is Phase 2A of a four phase project to replace the critical infrastructure on Principale Steet. The project aims to help ensure the community has access to reliable potable water, and can better manage wastewater and storm water in an environmentally sustainable manner. As well as being able to use active transportation to safely commute through the downtown area. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Cement, Waste Processing and Treatment, Chemical (Industrial), Road, Manufacturing (Industrial) |
Article published date | 2026-04-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
