logo

Tracadie - Principale St. Infrastructure - Phase 2A

Sector: Chemical (Industrial) • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration proble

Project Information FAQ

Project Information

3 Q
The project “Tracadie - Principale St. Infrastructure - Phase 2A” is an infrastructure initiative in the Chemical (Industrial) sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the Tim Horton’s and civic address 3484 Principale St. The ageing pipes are in very poor condition and are in need of repair to address infiltration problem and to avoid annual water main breaks. The scope of work will include: - Replacing 330 metres of existing and adding 230 metres of new concrete-asbestos sanitary sewer mains with polyvinyl chloride (PVC) lines - Replacing 330 metres of existing and adding 230 metres of new iron pipe water mains with PVC lines - Replacing 330 metres of existing concrete storm sewers with high-density polyethylene pipe and concrete pipe - One new wastewater pump station - Reinstating the road along the 0.33km area of work, with the addition of active transportation concepts such as a bike path. The streetlights will be upgraded to LED, along with a 435m section from Phase 1. This project is Phase 2A of a four phase project to replace the critical infrastructure on Principale Steet. The project aims to help ensure the community has access to reliable potable water, and can better manage wastewater and storm water in an environmentally sustainable manner. As well as being able to use active transportation to safely commute through the downtown area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data