logo

Tracadie - Principale St. Infrastructures - Phase 2B

Sector: Cement • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
In Progress

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the civic address 3484 Principale St and intersection of Albert St. The ageing pipes are in very poor condition and are in need of repair to address infilt

Status
Under Construction
Sector
Cement, Metal, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Road, Steel, Government
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Tracadie - Principale St. Infrastructures - Phase 2B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tracadie - Principale St. Infrastructures - Phase 2B” is an infrastructure initiative in the Cement sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of renewing ageing sanitary sewer, water and storm sewer mains on Principale Street in the regional municipality of Tracadie, New Brunswick. This project will focus on a section in the busiest zone of the downtown, between the civic address 3484 Principale St and intersection of Albert St. The ageing pipes are in very poor condition and are in need of repair to address infiltration problem and to avoid annual water main breaks. The scope of work will include: - Replacing 105 metres of existing concrete-asbestos sanitary sewer mains with PVC lines - Replacing 105 metres of existing iron pipe water mains with PVC lines - Replacing 105 metres of existing concrete storm sewers with high-density polyethylene pipe and concrete pipe - Reinstating the road along the 0.11km area of work, with the addition of active transportation concepts such as a bike path. This project is Phase 2B of a four phase project to replace the critical infrastructure on Principale Street. The project aims to help ensure the community has access to reliable potable water, and can better manage wastewater and storm water in an environmentally sustainable manner. As well as being able to use active transportation to safely commute through the downtown area.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Cement, Metal, Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment, Road, Steel, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project