logo

Track 4B (Edra) Power Plant Phase III

Sector: Power Generation (CCGT) • Location: Malaysia

Source: Reconnecting Asia

Project
Under Construction

Track 4B (Edra) Power Plant Phase III

Status
Under Construction
Sector
Power Generation (CCGT), Natural Gas, Oil and Gas, Manufacturing (Industrial)
Location
Malaysia
Updated
22 Jul 2026
Source
Reconnecting Asia

ConstructChat

Ask ConstructChat about Track 4B (Edra) Power Plant Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Track 4B (Edra) Power Plant Phase III” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Malaysia. Taiyo aggregates data on it from Reconnecting Asia.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Track 4B (Edra) Power Plant Phase III

Original sector

Powerplant

Budget

Location

Country

Malaysia

Source

Source reliability

Medium

Source

Reconnecting Asia

More Details

Record type

Project

Sector

Power Generation (CCGT), Natural Gas, Oil and Gas, Manufacturing (Industrial)

Article published date

2023-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project