Track Field Facility Improvement
One of 10,000+ projects Taiyo tracks in Oregon.
Source: Dodge
Track and Field Facility Improvements Project consists of site preparation and excavation followed by construction of a mechanically stabilized earth wall, new track surface, installation of select athletic event equipment, ADA compliant spectator seating area, fencing, utilities improvements, installation of controlled access points, and parking lot improvements for an NCAA Class 3 compliant trac
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Government, Automotive, Power Generation (CCGT)
- Location
- Roseburg, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Track Field Facility Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Track and Field Facility Improvements Project consists of site preparation and excavation followed by construction of a mechanically stabilized earth wall, new track surface, installation of select athletic event equipment, ADA compliant spectator seating area, fencing, utilities improvements, installation of controlled access points, and parking lot improvements for an NCAA Class 3 compliant track event facility. The project will be comprised of new materials and does include connections to ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Roseburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Road, Commercial, Car parking, Government, Automotive, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
