Traction Power Sub Station Equipment Replacement Wave 1
Sector: Power Generation (CCGT) • Location: Atlanta, Georgia, United States of America
Source: Dodge
The Work of this Project generally consists of a priority-based renovation and replacement of existing traction power equipment at Traction Power Substations (TPSS) and Gap Breaker Stations (GBS) at East and West locations along the Blue and Green Lines and at North and South locations along the Red and Gold Lines. The Project is located within the Atlanta Metropolitan Area, as shown in the Contra
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Traction Power Sub Station Equipment Replacement Wave 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work of this Project generally consists of a priority-based renovation and replacement of existing traction power equipment at Traction Power Substations (TPSS) and Gap Breaker Stations (GBS) at East and West locations along the Blue and Green Lines and at North and South locations along the Red and Gold Lines. The Project is located within the Atlanta Metropolitan Area, as shown in the Contract Drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
