Traffic Calming Improvements Phase II
Sector: Water Supply and Storage • Location: Santa Ana, California, United States of America
Source: Dodge USA
Scope of work includes removal and installation of asphalt concrete pavement, new concrete accessible curb ramps, storm drain and catch basin improvements, installation of water quality treatment modular wetland system, construction of traffic circle, and new signing and striping.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Consumer Products, Government, Commercial
- Location
- Santa Ana, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Traffic Calming Improvements Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work includes removal and installation of asphalt concrete pavement, new concrete accessible curb ramps, storm drain and catch basin improvements, installation of water quality treatment modular wetland system, construction of traffic circle, and new signing and striping. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Ana |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Consumer Products, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
