Traffic Engineering Yard-Equipment Shed Office
Closed · Manitoba · Last reported Apr 2024
Source: Dodge USA
Demolition of an existing steel frame building including concrete foundation and floor, construction of a crushed rock and granular base course foundation pad, and the complete construction of a heated equipment storage shed (76 x 52 ), attached office lunchroom (21 x 38 ), and a heated building addition (18 x 11 ) at the Traffic Engineering Yard, 8385 Wilkes Avenue, Headingley, MB.
- Status
- Closed
- Sector
- Commercial, Cement, Steel, Warehouse, Residential, Government, Metal, Manufacturing (Industrial)
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Traffic Engineering Yard-Equipment Shed Office
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition of an existing steel frame building including concrete foundation and floor, construction of a crushed rock and granular base course foundation pad, and the complete construction of a heated equipment storage shed (76 x 52 ), attached office lunchroom (21 x 38 ), and a heated building addition (18 x 11 ) at the Traffic Engineering Yard, 8385 Wilkes Avenue, Headingley, MB. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Steel, Warehouse, Residential, Government, Metal, Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
