Traffic Incident Management Program Benefit-Cost Estimation Tool
Sector: Education • Location: Washington, United States of America (USA)
Source: Federal Highway Administration (FHWA)
Traffic incidents contribute significantly to service level deterioration of both freeways and arterials. Traffic incident management (TIM) programs have been introduced worldwide with the aim of mitigating the impact of traffic incidents on safety and roadway performance. These programs support quick incident response, thereby shortening incident duration, and control traffic demand around the in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Traffic incidents contribute significantly to service level deterioration of both freeways and arterials. Traffic incident management (TIM) programs have been introduced worldwide with the aim of mitigating the impact of traffic incidents on safety and roadway performance. These programs support quick incident response, thereby shortening incident duration, and control traffic demand around the incident scene. Some TIM programs can be costly to taxpayers, thus, it is important to be able to evaluate their benefits and determine the associated return on investment. Benefit-Cost (B/C) estimation studies have been conducted for numerous programs, the majority of which have related to service safety patrols (SSP). These studies employ a wide range of estimation methodologies and monetary equivalent conversion factors. Consequently, resulting B/C ratio estimates vary widely and have been shown to be sensitive to these choices. Moreover, these studies can be quite costly. Thus, a standardized methodology that can be universally and equitably employed in such B/C ratio estimation is essential to creating consistency and, therefore, greater confidence in the validity of the results. With access to this methodology in the form of a simple-to-use, less data-intensive tool, TIM programs and taxpayers alike can benefit from cost-effective evaluations. A tool with such capability has been created, but with specialized applicability. Specifically, the SSP-BC tool was developed to serve SSP program evaluation needs. We intend to enhance and roll out the current SSP-BC tool and then modify this tool to create a standardized simple to use TIM program B/C cost estimation tool for a wider class of TIM programs/strategies. This project would identify and develop additional capabilities required to meet the needs of chosen TIM scenarios/program B/C ratio estimation. Methodologies and implementations embedded within the SSP-BC tool will provide a foundation for the creation of a B/C ratio estimation capability. This effort will culminate in a robust software platform for a TIM B/C estimation tool, including open source code and needed documentation. Study areas for tool development and validation will be selected based on availability of quality data and consideration for needed geographic diversity. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
