logo
ProjectClosed

Traffic Signal Improvements

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge USA

The general items of work include, but not limited to, clearing and grubbing; removal and installation of new traffic signal equipment; removal and installation of a new electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; installation of a new traffic signal at the existing pedestrian crosswalk at Verdugo Boulevard and Cherry

Status
Closed
Sector
Government, Cement, Commercial, Car parking, Automotive, Road, Power Generation (CCGT)
Location
La Cañada Flintridge, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Traffic Signal Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Traffic Signal Improvements” is an infrastructure initiative in the Government sector, located in La Cañada Flintridge, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The general items of work include, but not limited to, clearing and grubbing; removal and installation of new traffic signal equipment; removal and installation of a new electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; installation of a new traffic signal at the existing pedestrian crosswalk at Verdugo Boulevard and Cherry Canyon Trail; removal and replacement of asphalt concrete pavement; signage; and striping modifi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

La Cañada Flintridge

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Cement, Commercial, Car parking, Automotive, Road, Power Generation (CCGT)

Article published date

2024-11-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project