Traffic Signal Optimization and Timing
One of 10,000+ projects Taiyo tracks in Tennessee.
Source: Dodge USA
Required Scope of Services Traffic engineering Signal design Signal optimization and timing Travel time runs and traffic data collection Preparation of NEPA technical studies and documentation Air quality analysis for CMAQ grant compliance Familiarity with CMAQ grant documentation requirements The traffic signals included in this project are as follows: SR-6 at Thompsons Station Road SR-6 at Buckn
- Status
- Prospective
- Sector
- Road, Government, Commercial
- Location
- Spring Hill, Tennessee, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Traffic Signal Optimization and Timing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Required Scope of Services Traffic engineering Signal design Signal optimization and timing Travel time runs and traffic data collection Preparation of NEPA technical studies and documentation Air quality analysis for CMAQ grant compliance Familiarity with CMAQ grant documentation requirements The traffic signals included in this project are as follows: SR-6 at Thompsons Station Road SR-6 at Buckner Road SR-6 at Mary Ann Circle/Williford Court (under construction, expected to be complete in F... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Spring Hill |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
