Trail - Memorial Centre Energy Recovery and Retrofits
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Infrastructure Canada
The proposed project at the existing Trail Memorial Centre recreation centre will recover heat from arena refrigeration and other sources and will upgrade and integrate HVAC equipment to use the recovered heat for domestic water heating, space heating, and air handling. The project will reduce up to 73% of the building’s greenhouse gas emissions by improving energy efficiency and displacing natura
- Status
- Under Construction
- Sector
- Stadium, Natural Gas, Water Supply and Storage, Commercial
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Trail - Memorial Centre Energy Recovery and Retrofits
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project at the existing Trail Memorial Centre recreation centre will recover heat from arena refrigeration and other sources and will upgrade and integrate HVAC equipment to use the recovered heat for domestic water heating, space heating, and air handling. The project will reduce up to 73% of the building’s greenhouse gas emissions by improving energy efficiency and displacing natural gas use, and will improve building cooling and indoor air quality. The project works will include: - heat recovery systems, including desuperheater, energy recovery condenser, heat pumps, heating loop piping and fixtures, and heat exchanger(s); - domestic water pre-heating system and perimeter radiant space heating integrated with heating loop(s); - replacement desiccant dehumidifier with heating coil and approximately 11 replacement gas-fired rooftop air-handling units (AHUs) with hydronic coils, all integrated with heating loop(s); - energy analysis dashboard; and - site work, mechanical, electrical, control/monitoring, signage, and other related works and appurtenances. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Stadium, Natural Gas, Water Supply and Storage, Commercial |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Stadium projects in Canada
- CE Franklin Warehouse
- Doug Mitchell Thunderbird Sports Centre
- South Fish Creek Recreation Complex
- One32 Berkeley Apartments
- Niverville Community Resource Centre
- God’s Lake Narrows First Nation Arena/Multiplex
- Patrick Connors Recreational Complex – Fundy Arena upgrades
- Village of Grande-Anse Centre Edmond E. Landry upgrade
