Trail - Memorial Centre Energy Recovery and Retrofits
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The proposed project at the existing Trail Memorial Centre recreation centre will recover heat from arena refrigeration and other sources and will upgrade and integrate HVAC equipment to use the recovered heat for domestic water heating, space heating, and air handling. The project will reduce up to 73% of the building’s greenhouse gas emissions by improving energy efficiency and displacing natura
- Status
- Under Construction
- Sector
- Water Supply and Storage, Natural Gas, Stadium, Commercial, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Trail - Memorial Centre Energy Recovery and Retrofits
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in progress |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project at the existing Trail Memorial Centre recreation centre will recover heat from arena refrigeration and other sources and will upgrade and integrate HVAC equipment to use the recovered heat for domestic water heating, space heating, and air handling. The project will reduce up to 73% of the building’s greenhouse gas emissions by improving energy efficiency and displacing natural gas use, and will improve building cooling and indoor air quality. The project works will include: - heat recovery systems, including desuperheater, energy recovery condenser, heat pumps, heating loop piping and fixtures, and heat exchanger(s); - domestic water pre-heating system and perimeter radiant space heating integrated with heating loop(s); - replacement desiccant dehumidifier with heating coil and approximately 11 replacement gas-fired rooftop air-handling units (AHUs) with hydronic coils, all integrated with heating loop(s); - energy analysis dashboard; and - site work, mechanical, electrical, control/monitoring, signage, and other related works and appurtenances. |
Original sector | Community, Culture and Recreation |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Natural Gas, Stadium, Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
