logo

Trail Exchange

Sector: Power Generation (CCGT) • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project is for transit exchange design and roadway improvements to expand and refurbish the transit exchange in Trail, BC, part of the West Kootenay Transit System. Improvements include six concrete bus pads that can accommodate standard capacity buses, three BC Transit bus shelters and up to nine benches, utility works including electrical power shelter lighting, sidewalk widening and reconst

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Water Supply and Storage, Car parking, Cement, Automotive, Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Trail Exchange

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Trail Exchange” is an infrastructure initiative in the Power Generation (CCGT) sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is for transit exchange design and roadway improvements to expand and refurbish the transit exchange in Trail, BC, part of the West Kootenay Transit System. Improvements include six concrete bus pads that can accommodate standard capacity buses, three BC Transit bus shelters and up to nine benches, utility works including electrical power shelter lighting, sidewalk widening and reconstruction, street resurfacing and line and crosswalk painting and related ancillary infrastructure (e.g., landscaping, irrigation), installation of up to six bicycle racks, and an operator washroom facility. The 2016 Greater Trail Transit service review and the Downtown Trail Transit Exchange Study (2021) identified the need for a new and expanded downtown transit exchange to improve the customer experience and support future increased transit service levels. This will increase the transit exchange capacity by two buses and includes the flexibility of independent arrival and departure maneuverability.

Original sector

Public Transit

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Water Supply and Storage, Car parking, Cement, Automotive, Road

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project