Trail Maintenance & Enhancement at Baileys Trail System
Sector: Water Supply and Storage • Location: Nelsonville, Ohio, United States of America
Source: Dodge USA
This invitation to provide quotes is for multiple contractors to provide labor, equipment, supplies and materials in performing operations necessary for the following project components: 1) Widen tread on 5.35 miles of trail to accommodate adaptive mountain bikes; and 2) Address drainage and erosion concerns on the same 5.35 miles of trails to ensure adaptive mountain bike standards are met in the
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Mass Transit, Government, Rail, Car parking, Automotive, Waste Processing and Treatment
- Location
- Nelsonville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Trail Maintenance & Enhancement at Baileys Trail System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Notice of Completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This invitation to provide quotes is for multiple contractors to provide labor, equipment, supplies and materials in performing operations necessary for the following project components: 1) Widen tread on 5.35 miles of trail to accommodate adaptive mountain bikes; and 2) Address drainage and erosion concerns on the same 5.35 miles of trails to ensure adaptive mountain bike standards are met in the WAYNE NATIONAL FOREST |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Nelsonville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Mass Transit, Government, Rail, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
