Trails Edge Estates Condominium Development PHASE 1
Start · Ohio · Last reported Apr 2024
Source: Dodge USA
approx sf - Each building offers an open floor plan with no steps, featuring 2 bedrooms, 2 bathrooms, and a 2-car heated garage, totaling 1,400 square feet for units without basements. For those not ready to fully downsize, several units offer basements. Constructed with metal roofs, Insulated Concrete Form (ICF) walls
- Status
- Under Construction
- Sector
- Automotive, Metal, Cement, Commercial, Residential, Car parking, Mass Transit, Rail, Manufacturing (Industrial)
- Location
- Millersburg, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Trails Edge Estates Condominium Development PHASE 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | approx sf - Each building offers an open floor plan with no steps, featuring 2 bedrooms, 2 bathrooms, and a 2-car heated garage, totaling 1,400 square feet for units without basements. For those not ready to fully downsize, several units offer basements. Constructed with metal roofs, Insulated Concrete Form (ICF) walls |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Millersburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Metal, Cement, Commercial, Residential, Car parking, Mass Transit, Rail, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
