Train Control System on the Montreal Metro Blue Line
Sector: Mass Transit • Location: Quebec, Canada
Source: Infrastructure Canada
The train control system project is intended to replace the current fixed-block train control system with a system that uses Communication Based Train Control (CBTC) technology throughout the Montréal Metro Blue line, including the line’s extension to prevent obsolescence and potential related issues. The project involves a combination of hardware and software that enables trains to travel safe
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | in progress |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The train control system project is intended to replace the current fixed-block train control system with a system that uses Communication Based Train Control (CBTC) technology throughout the Montréal Metro Blue line, including the line’s extension to prevent obsolescence and potential related issues. The project involves a combination of hardware and software that enables trains to travel safely along metro tracks and effectively meet operating needs. The CBTC system includes equipment on the ground, a ground/train data transmission system and equipment on board trains. The project also includes changes to 28 Azur trains (MPM10) that will be used on the Blue line and extension. The replacement of the train control system will first take place on the existing section of the Blue line (12 stations), including the Snowdon station tail track; the De Castelnau connection, which includes a test track; and the Youville workshop, which includes workshop tracks. It will then be installed on the Blue line extension (5 stations) and at the future garage at the Anjou station. The project will improve the quality of public transit with cutting-edge technology that will ensure the network remains viable for the coming decades, improve service regularity, reduce service disruptions, allow long-distance diagnostics and increase passenger comfort through preventive braking. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
