logo

Tram network extension PPP project in Nottingham

Sector: Rail • Location: UK (United Kingdom)

Source: InfraPPPWorld

Project
Project In Operation

The project involves the extension and operation of the tram network in Nottingham, located in central England. The concessionaire has taken over operations of the existing line, which opened in 2004, from Nottingham railway station to Hucknall and Phoenix Park, to the north of the city centre; and constructed two extensions to the south (Clifton) and west (Chilwell) of the city.The completed netw

Project Information FAQ

Project Information

5 Q
The project “Tram network extension PPP project in Nottingham” is an infrastructure initiative in the Rail sector, located in UK (United Kingdom). Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in operation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the extension and operation of the tram network in Nottingham, located in central England. The concessionaire has taken over operations of the existing line, which opened in 2004, from Nottingham railway station to Hucknall and Phoenix Park, to the north of the city centre; and constructed two extensions to the south (Clifton) and west (Chilwell) of the city.The completed network under operation spans 32 km. It consists of two lines that cross the city, running together on a common section for the middle part of their journey, including the city centre section. Line 1 runs between Chilwell and Hucknall, features a total of 33 or 34 tram stops, depending on direction, and has a journey time throughout of 62 minutes. Line 2 runs between Clifton and Phoenix Park, features 27 or 28 tram stops, depending on direction, and has a journey time throughout of 47 minutes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data