Tramore Road Culvert Replacement and Ditching
Completed · Ontario
Source: Infrastructure Canada
A major 60" culvert on Tramore Road at Eady Road will be replaced along with various cross and driveway culverts. Approximately 1,800 meters of ditching is required as well in order to eliminate road flooding and wash outs. Project will allow proper stormwater drainage on Tramore Road thereby allowing for future resurfacing.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Waste Processing and Treatment
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Tramore Road Culvert Replacement and Ditching
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A major 60" culvert on Tramore Road at Eady Road will be replaced along with various cross and driveway culverts. Approximately 1,800 meters of ditching is required as well in order to eliminate road flooding and wash outs. Project will allow proper stormwater drainage on Tramore Road thereby allowing for future resurfacing. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Waste Processing and Treatment |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
