Tranquility Lakes Detention Pump Station Rehabilitation
Sector: Water Supply and Storage • Location: Pearland, Texas, United States of America
Source: Dodge
The drainage system was turned over to the City when MUD1 was dissolved. The existing pumps are undersized to remove the required amount of water during a storm event. The force main is also undersized and cannot transmit the correct amount of flow out of the system and discharge to the BDD4 ditch. During intense rains or prolonged rain events, there is significant roadside flooding as the system
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
- Location
- Pearland, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tranquility Lakes Detention Pump Station Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The drainage system was turned over to the City when MUD1 was dissolved. The existing pumps are undersized to remove the required amount of water during a storm event. The force main is also undersized and cannot transmit the correct amount of flow out of the system and discharge to the BDD4 ditch. During intense rains or prolonged rain events, there is significant roadside flooding as the system backs up and cannot keep up with the rainfall. Due to the critical nature of this stormwater pump... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Pearland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
