logo

Trans-Asia Guimaras Wind Farm

Sector: Oil and Gas • Location: Guimaras, Philippines

Source: World Bank Group

Project
Active

Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids.

The turbines were to be th

Status
Prospective
Sector
Oil and Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Solar, Commercial
Location
Guimaras, Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Trans-Asia Guimaras Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Trans-Asia Guimaras Wind Farm” is an infrastructure initiative in the Oil and Gas sector, located in Guimaras, Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids. The turbines were to be the Gamesa G90 turbines, with a lifespan of 20 years and a capacity factor of 28.4%. Commissioning was expected for Q1 2014. The Feed-in Tariff for the project was 8.53 PHP/kWh ($0.20 per kWh). The first equipment supply contract was to be signed in December 2011. The FiT were for 20 years. the connection to the transmission line was secured in February 2012. The EPC was negotiated in June 2012. Construction was expected to begin in July 2012. Total investment was to be $151,066,875. The project applied for UNFCCC/CDM financing (December 2011). Financial closure date was unknown, but in November 2012 FC was reported as 'close to pocketing' for a total amount of PHP 4.3 billion (US$104 million) in debt. http://cdm.unfccc.int/filestorage/V/7/N/V7N1L5KQH0XD2TGBAC6UOJYEIWPZM4/ESBI_PDD.pdf?t=YVd8bTI4NmFlfDC6Tu1ECmnNiXQInV_6QcBL http://www.neda-rdc6.ph/site/rpmc6/on_PowGen_Wind-TAREC.pdf http://manilastandardtoday.com/2012/09/08/guimaras-wind-farm-set-to-begin/ http://www.thedailyguardian.net/index.php/local-news/9488-trans-asia-starts-wind-energy-farm-construction-in-guimaras-in-july Source on tariff: Philippines launches solar, wind FiTs of US0.23-0.20/kWh, ADPREN, 27 July 2012

Original sector

Energy

Budget

Location

Country

Philippines

State

Guimaras

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Oil and Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Solar, Commercial

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project