Trans-Asia Guimaras Wind Farm
Sector: Oil and Gas • Location: Guimaras, Philippines
Source: World Bank Group
Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids.
The turbines were to be th
- Status
- Prospective
- Sector
- Oil and Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Solar, Commercial
- Location
- Guimaras, Philippines
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Trans-Asia Guimaras Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids. The turbines were to be the Gamesa G90 turbines, with a lifespan of 20 years and a capacity factor of 28.4%. Commissioning was expected for Q1 2014. The Feed-in Tariff for the project was 8.53 PHP/kWh ($0.20 per kWh). The first equipment supply contract was to be signed in December 2011. The FiT were for 20 years. the connection to the transmission line was secured in February 2012. The EPC was negotiated in June 2012. Construction was expected to begin in July 2012. Total investment was to be $151,066,875. The project applied for UNFCCC/CDM financing (December 2011). Financial closure date was unknown, but in November 2012 FC was reported as 'close to pocketing' for a total amount of PHP 4.3 billion (US$104 million) in debt. http://cdm.unfccc.int/filestorage/V/7/N/V7N1L5KQH0XD2TGBAC6UOJYEIWPZM4/ESBI_PDD.pdf?t=YVd8bTI4NmFlfDC6Tu1ECmnNiXQInV_6QcBL http://www.neda-rdc6.ph/site/rpmc6/on_PowGen_Wind-TAREC.pdf http://manilastandardtoday.com/2012/09/08/guimaras-wind-farm-set-to-begin/ http://www.thedailyguardian.net/index.php/local-news/9488-trans-asia-starts-wind-energy-farm-construction-in-guimaras-in-july Source on tariff: Philippines launches solar, wind FiTs of US0.23-0.20/kWh, ADPREN, 27 July 2012 |
Original sector | Energy |
Budget |
Location
Country | Philippines |
State | Guimaras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Solar, Commercial |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
