Trans-Asia Guimaras Wind Farm

Sector: Oil and Gas • Location: Philippines

Source: World Bank Group

Project
Active

Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids.

The turbines were to be th

Project Information FAQ

Project Information

5 Q
The project “Trans-Asia Guimaras Wind Farm” is an infrastructure initiative in the Oil and Gas sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Trans-Asia Renewable Energy Corporation, a subsidiary of Trans-Asia Oil and Energy Development Corporation (PSE:TA), was planning the development of the 54MW San Lorenzo Wind Farm, San Lorenzo municipality, Guimaras Province. The project was to consist of 27 turbines of 2.0MW, generating 120,790 MWh annually to be supplied to the Luzon and Visayas Electric Power Grids. The turbines were to be the Gamesa G90 turbines, with a lifespan of 20 years and a capacity factor of 28.4%. Commissioning was expected for Q1 2014. The Feed-in Tariff for the project was 8.53 PHP/kWh ($0.20 per kWh). The first equipment supply contract was to be signed in December 2011. The FiT were for 20 years. the connection to the transmission line was secured in February 2012. The EPC was negotiated in June 2012. Construction was expected to begin in July 2012. Total investment was to be $151,066,875. The project applied for UNFCCC/CDM financing (December 2011). Financial closure date was unknown, but in November 2012 FC was reported as 'close to pocketing' for a total amount of PHP 4.3 billion (US$104 million) in debt. http://cdm.unfccc.int/filestorage/V/7/N/V7N1L5KQH0XD2TGBAC6UOJYEIWPZM4/ESBI_PDD.pdf?t=YVd8bTI4NmFlfDC6Tu1ECmnNiXQInV_6QcBL http://www.neda-rdc6.ph/site/rpmc6/on_PowGen_Wind-TAREC.pdf http://manilastandardtoday.com/2012/09/08/guimaras-wind-farm-set-to-begin/ http://www.thedailyguardian.net/index.php/local-news/9488-trans-asia-starts-wind-energy-farm-construction-in-guimaras-in-july Source on tariff: Philippines launches solar, wind FiTs of US0.23-0.20/kWh, ADPREN, 27 July 2012

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data