logo
ProjectIn Progress

Trans-Canada Highway 1 - Quartz Creek

Sector: Bridge • Location: British Columbia, Canada

Source: Infrastructure Canada

This project will upgrade approximately 4.9 km of the Trans-Canada Highway (TCH) and replace the Quartz Creek Bridge No. 1607. The west limit of the project begins approximately 1.7 km west of the existing bridge and extends through its terminus 3.4 km east of the existing bridge. The proposed highway realignment will shorten the corridor slightly. The key elements of the project scope are: • Rep

Status
Under Construction
Sector
Bridge, Commercial, Road
Location
British Columbia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Trans-Canada Highway 1 - Quartz Creek

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Trans-Canada Highway 1 - Quartz Creek” is an infrastructure initiative in the Bridge sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will upgrade approximately 4.9 km of the Trans-Canada Highway (TCH) and replace the Quartz Creek Bridge No. 1607. The west limit of the project begins approximately 1.7 km west of the existing bridge and extends through its terminus 3.4 km east of the existing bridge. The proposed highway realignment will shorten the corridor slightly. The key elements of the project scope are: • Replacement of the existing Quartz Creek Bridge No. 1607, which is nearing the end of its design life. • Improve approximately 4.9 km of the TCH by upgrading to a four-lane cross-section for a distance of approximately 4.4 km with a 2.6 m flush median and provisions for median barrier. • Horizontal curvature and other geometrics improvements for 100 km/h design speed. • Auxiliary lanes for access to and from Quartz Creek Forest Service Road (FSR) and maintain access to and from Heather Road and un-named FSR, and the access road east of the bridge. • Replacement of the Wiseman Creek Culvert with a new bridge.

Original sector

Roads, Bridges and Trade Infrastructure

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Bridge, Commercial, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project