logo

Trans-Canada Highway 1 Four-Laning - Jumping Creek to Jack MacDonald Snow Shed

Sector: Road • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The key elements of the Project include: •2.6 km of four-lane construction (replacing existing 2-laning) along the Trans-Canada Highway complete with median barrier; •Roadside ditches designed for rockfall catchment; •Drape mesh applied to all rock cuts greater than 20 metres (m); •Soil nail retaining walls (reinforced bars driven into the slope) on cut slopes that exceed 30 m in length to mitigat

Project Information FAQ

Project Information

4 Q
The project “Trans-Canada Highway 1 Four-Laning - Jumping Creek to Jack MacDonald Snow Shed” is an infrastructure initiative in the Road sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The key elements of the Project include: •2.6 km of four-lane construction (replacing existing 2-laning) along the Trans-Canada Highway complete with median barrier; •Roadside ditches designed for rockfall catchment; •Drape mesh applied to all rock cuts greater than 20 metres (m); •Soil nail retaining walls (reinforced bars driven into the slope) on cut slopes that exceed 30 m in length to mitigate avalanche hazards above the highway; •A modified median treatment in sections with reduced sight distance due to highway curvature designed in accordance with the British Columbia Supplement to Transportation Association of Canada (TAC) design guidelines; •Replacement of all existing culverts, designed in accordance with British Columbia climate change adaptation guidelines; and •Replacement of the existing creek crossing culvert with a proposed 2,590 mm culvert.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data