Trans Mountain Expansion Optimization Project
One of 135 projects Taiyo tracks in Alberta, British Columbia.
Source: Canadian Broadcasting Corporation (CBC)
The Trans Mountain expansion oil pipeline, completed in May 2024, is exploring two methods to increase oil export capacity without changing the physical size of the pipeline. These methods include using drag reducing agents to increase capacity by 5-10% and building stronger pumping stations to push more oil through the pipe. The optimization project is under exploration with a final investment de
- Status
- Prospective
- Sector
- Oil and Gas, Government, Commercial
- Location
- Edmonton, Burnaby, Alberta, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Canadian Broadcasting Corporation (CBC)
ConstructChat
Ask ConstructChat about Trans Mountain Expansion Optimization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under exploration |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Trans Mountain expansion oil pipeline, completed in May 2024, is exploring two methods to increase oil export capacity without changing the physical size of the pipeline. These methods include using drag reducing agents to increase capacity by 5-10% and building stronger pumping stations to push more oil through the pipe. The optimization project is under exploration with a final investment decision expected next year, followed by a few years of construction for the pumping stations. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | Alberta, British Columbia |
City | Edmonton, Burnaby |
Source
Source | Canadian Broadcasting Corporation (CBC) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Government, Commercial |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
