logo

Trans-Pecos Pipeline Project, Texas

Sector: Manufacturing (Industrial) • Location: United States

Source: Hydrocarbon Technology

Project
Closed

The Trans-Pecos pipeline project is an intrastate pipeline that was constructed by the ETP Consortium comprising Energy Transfer Partners, Carso Energy and MasTec as part of an agreement with Mexico’s federal electricity commission, Comisión Federal de Electricidad. The $767m pipeline transports clean-burning natural gas from Pecos, Brewster and Presidio counties to the US-Mexico boundary near Pr

Project Information FAQ

Project Information

3 Q
The project “Trans-Pecos Pipeline Project, Texas” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in United States. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Trans-Pecos pipeline project is an intrastate pipeline that was constructed by the ETP Consortium comprising Energy Transfer Partners, Carso Energy and MasTec as part of an agreement with Mexico’s federal electricity commission, Comisión Federal de Electricidad. The $767m pipeline transports clean-burning natural gas from Pecos, Brewster and Presidio counties to the US-Mexico boundary near Presidio, Texas. It is operated by the ETP Consortium. An application was filed in May 2015 for the issuance of a presidential permit with FERC in relation to the pipeline’s construction. Construction on the project began in the first quarter of 2016 and was completed in early 2017. The pipeline came on line in March 2017. The pipeline is expected to increase the supply of natural gas throughout the region in order to meet the expanding needs of the area’s electricity generation plants and potential industrial customers in Mexico. The Trans-Pecos pipeline is 148mi (238km) long and 42in in diameter, and transports approximately 1.4 billion cubic feet (bcf) of natural gas a day. It originates in the Waha hub outside Fort Stockton in northern Pecos County and traverses a distance of 47mi (75km) across the county. The entire pipeline includes one 70,000hp compressor station equipped with 14 compressors at the Waha hub. It also includes a new meter station adjacent to the county road 170. The pipeline covers a distance of 33mi (53.1km) in Brewster County and has one tap installed at the delivery point. In addition, the pipeline’s Presidio County portion is 63mi (101.3km) long and has three taps installed at the delivery points within the county. The pipeline corridor spans the existing 29mi (46.6km) of power lines and 6.5mi (10.46km) railroads in order to minimise the pipeline’s impact on the surrounding areas. It runs through the Pecos, Brewster and Presidio counties. The network begins in northern Pecos County and enters central-west Texas, running along the Brewster County and terminating at the US-Mexico boundary in Presidio County in the Rio Grande River. It also interconnects with an existing pipeline near Ojinaga, Chihuahua, Mexico. The natural gas pipeline was designed and constructed in compliance with federal safety requirements. It was buried at a minimum depth of 48in in some areas and has a thickness between 0.6in and 0.86in. The pipeline was placed at a depth of 70ft under the Rio Grande river bed using a full horizontal-directional drill technique in order to ensure the integrity and overall safety of the pipeline. It was hydrostatically tested before placing in service. The pipeline provides tax benefits of roughly $7.1m to the counties along its route, including $1.4m for Pecos County, $1m for Brewster County, $1.9m for Presidio County and $2.8m of additional costs. It also brings significant economic benefits to local communities by procuring goods and services from local businesses. The pipeline network generated approximately 350 construction and labour jobs during its construction phase. Furthermore, the project improves the air quality in the region as it replaces northern Mexico’s fuel sources with clean-burning natural gas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data