logo

Transgabonais concession

Sector: Commercial • Location: Estuaire Province, Gabon

Source: World Bank Group

Project
Cancelled

In 1999, Transgabonais was awarded a 20 year concession contract to rehabilitate and operate the railway that linked Owendo to Franceville. Transgabonais was a consortium of the 51% state-owned national logging company Societe nationale des bois du Gabon (SNCB) (43.1%), Belgian firm Transurb Technirail Transurb (11.6%), Deutsche Investitions und Entwicklungsgesellschaft (DEG) (16.33%) and several

Status
Failure
Sector
Commercial, Mass Transit, Government, Rail, Residential
Location
Estuaire Province, Gabon
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Transgabonais concession

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Transgabonais concession” is an infrastructure initiative in the Commercial sector, located in Estuaire Province, Gabon. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 1999, Transgabonais was awarded a 20 year concession contract to rehabilitate and operate the railway that linked Owendo to Franceville. Transgabonais was a consortium of the 51% state-owned national logging company Societe nationale des bois du Gabon (SNCB) (43.1%), Belgian firm Transurb Technirail Transurb (11.6%), Deutsche Investitions und Entwicklungsgesellschaft (DEG) (16.33%) and several other private companies each with a small shareholding. The company took over the operation of the railway in December 2000, and was to operate the facility for a 20-year period. Before 1999 the railway was run by the state-owned company Office du chemin de fer transgabonais (Octra). A total of US$31.4 million was paid by the sponsors for the concession rights (20.5 billion CFA francs). The railway was mainly transporting manganese. In May 2003, the government terminated the concession contract. The government claimed that the operator had failed to pay its concession fees, meet required investment, provide sufficient business accounts, and meet facility maintenance expectations. One of the project sponsors, Compagnie d'Exploitation du Chemin de Fer Transgabonais, was expected to file a claim against the Gabonian government with an international arbitration tribunal (International Centre for Settlement of Investment Disputes - ICSID) in 2004. Setrag, a subsidiary of South African company Compagnie miniere de l'Ogooue (Comilog) which belonged to French group Eramet, was temporarily granted a management contract over Transgabonais after the concession termination. Setrag was expected to operate the railway until the government rewarded the operation of the railway. For updates on the arbitration proceedings, check: www.worldbank.org/icsid (case n. ARB/04/5)

Original sector

Transport

Procurement method

Budget

Location

Country

Gabon

State

Estuaire Province

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Mass Transit, Government, Rail, Residential

Article published date

2024-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project