logo

Transmisora Mejillones S.A.

Sector: Power Generation (CCGT) • Location: Chile

Source: Inter-American Development Bank (IADB)

Project
Repaid

Abengoa Chile S.A. is a company established in 1987 under Chilean law. Its main business lines include supplying infrastructure, as well as the construction, installation, operation, maintenance, and commercial operation of infrastructure for industrial facilities. Abengoa Chile S.A. is a subsidiary of Abengoa S.A., established in Seville, Spain.Abengoa Chile S.A. would provide, on a build-own-ope

Project Information FAQ

Project Information

4 Q
The project “Transmisora Mejillones S.A.” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Chile. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaid

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Abengoa Chile S.A. is a company established in 1987 under Chilean law. Its main business lines include supplying infrastructure, as well as the construction, installation, operation, maintenance, and commercial operation of infrastructure for industrial facilities. Abengoa Chile S.A. is a subsidiary of Abengoa S.A., established in Seville, Spain.Abengoa Chile S.A. would provide, on a build-own-operate basis, the requisite engineering, design, supply, construction, operation, and maintenance services for a double circuit 220 kV transmission line extending from the transmission towers of the Encuentro Substation (the main node of the Norte Grande Interconnected System – SING) to the string insulators of the transmission line’s entry portals to the future site of the Sierra Gorda Substation (hereinafter, the “Project”). The maximum power transmission would be 220 mega-volt-amperes (MVA), considering a power factor value of 0.98i.Abengoa Chile S.A. would establish Transmisora Mejillones S.A. as a special-purpose company to carry out the Project and would likewise be the Borrower of the IIC loan. The proceeds from the IIC loan would be used to partially finance the Project’s construction and implementation.Chile is the number one producer of copper, accounting for more than a third of the world’s copper production. Mining operations, such as the one being carried out by Sierra Gorda Sociedad Contractual Minera, are essential for Chile’s development.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data