Transmission and Distribution Engineering Services
Sector: Water Supply and Storage • Location: Illinois, United States of America
Source: Dodge USA
During the original term of the contract, Primera Engineers completed engineering design for two relay replacement jobs and have initiated engineering on two others. The relays being replaced are past useful life and have experienced failures over the last two years causing inadvertent tripping and outages. The replacement jobs designed by Primera were successfully installed in 2023. Based upon th
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Transmission and Distribution Engineering Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | During the original term of the contract, Primera Engineers completed engineering design for two relay replacement jobs and have initiated engineering on two others. The relays being replaced are past useful life and have experienced failures over the last two years causing inadvertent tripping and outages. The replacement jobs designed by Primera were successfully installed in 2023. Based upon the vendor s performance, the Utility would like to extend the contract for the first two option ye... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
