logo

Transmission Augmentation Project at South Kalamb Substation

Sector: Power Generation (CCGT) • Location: Maharashtra, India

Source: Mercomindia.com

Project
Awarded

Adani Energy Solutions has been selected by PFC Consulting to develop the interstate transmission system (ISTS) for the drawal of power from the South Kalamb substation: Part A in Maharashtra. The project involves augmenting the transformation capacity at the South Kalamb substation by installing three 1500 MVA, 765/400 kV interconnecting transformers, along with associated 765 kV and 400 kV bays

Status
Closed
Sector
Power Generation (CCGT)
Location
Maharashtra, India
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about Transmission Augmentation Project at South Kalamb Substation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Transmission Augmentation Project at South Kalamb Substation” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maharashtra, India. Taiyo aggregates data on it from Mercomindia.com.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Adani Energy Solutions has been selected by PFC Consulting to develop the interstate transmission system (ISTS) for the drawal of power from the South Kalamb substation: Part A in Maharashtra. The project involves augmenting the transformation capacity at the South Kalamb substation by installing three 1500 MVA, 765/400 kV interconnecting transformers, along with associated 765 kV and 400 kV bays and bus sectionalisation. It also includes installing bus reactors for reactive power support and implementing line-in-line-out across multiple 400 kV transmission lines, including the Nagothane–Padghe and Pune–Mumbai corridors, with associated line bays and substation works to facilitate reliable power flow and network integration. The project will be implemented under the build, own, operate, and transfer model and must be completed within 24 months of the transfer of the special-purpose vehicle.

Original sector

Grid

Budget

Location

Country

India

State

Maharashtra

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project