Transmission Development Project
Sector: Power Transmission • Location: Nigeria
Source: World Bank Group
The Transmission Development Project, will support the country's Government program of power sector reform, and privatization, by addressing the requirements of the transmission, and dispatch sub-sectors. Project components include: 1) investments, consisting of augmentations at five main grid substations, and grid system reactive compensation; supply and installation of grid system metering to en
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government, Commercial
- Location
- Nigeria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Transmission Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Transmission Development Project, will support the country's Government program of power sector reform, and privatization, by addressing the requirements of the transmission, and dispatch sub-sectors. Project components include: 1) investments, consisting of augmentations at five main grid substations, and grid system reactive compensation; supply and installation of grid system metering to enable the measurement of power supplied to unbundled distribution companies; and, the establishment of a new National Control Center with Supervisory Control and Data Acquisition (SCADA), and Energy Management System (EMS) facilities, including associated communications requirements. Grid distance protection relays will be replaced, to be specifically determined following the power system planning study, and, a management information system for the Transmission and System Operation Company (TransysCo), will be supplied and installed; 2) technical assistance, designed to establish, and operate the new TransysCo, will develop transmission, and system operations related to secondary regulations. Additionally, the operation of a wholesale power market will be established. Training programs will enhance managerial, legal, technical, and financial capabilities, covering the areas of sector regulation, financial management, social, and environmental issues, and technical aspects on transmission maintenance, and system operation; and, 3) the establishment of an environment, resettlement, and social unit, funded to support monitoring, and evaluation of project related environmental, and social issues, including the program for HIV/AIDS prevention. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Nigeria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
