logo

Transmission Development Project

Sector: Power Transmission • Location: Nigeria

Source: World Bank Group

Project
Closed

The Transmission Development Project, will support the country's Government program of power sector reform, and privatization, by addressing the requirements of the transmission, and dispatch sub-sectors. Project components include: 1) investments, consisting of augmentations at five main grid substations, and grid system reactive compensation; supply and installation of grid system metering to en

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Government, Commercial
Location
Nigeria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Transmission Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Transmission Development Project” is an infrastructure initiative in the Power Transmission sector, located in Nigeria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Transmission Development Project, will support the country's Government program of power sector reform, and privatization, by addressing the requirements of the transmission, and dispatch sub-sectors. Project components include: 1) investments, consisting of augmentations at five main grid substations, and grid system reactive compensation; supply and installation of grid system metering to enable the measurement of power supplied to unbundled distribution companies; and, the establishment of a new National Control Center with Supervisory Control and Data Acquisition (SCADA), and Energy Management System (EMS) facilities, including associated communications requirements. Grid distance protection relays will be replaced, to be specifically determined following the power system planning study, and, a management information system for the Transmission and System Operation Company (TransysCo), will be supplied and installed; 2) technical assistance, designed to establish, and operate the new TransysCo, will develop transmission, and system operations related to secondary regulations. Additionally, the operation of a wholesale power market will be established. Training programs will enhance managerial, legal, technical, and financial capabilities, covering the areas of sector regulation, financial management, social, and environmental issues, and technical aspects on transmission maintenance, and system operation; and, 3) the establishment of an environment, resettlement, and social unit, funded to support monitoring, and evaluation of project related environmental, and social issues, including the program for HIV/AIDS prevention.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Nigeria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project