Transmission, Distribution and Disaster
Sector: Power Transmission • Location: Viet Nam
Source: World Bank Group
The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution systems to meet demand, reduce losses and improve relativity; c) support power sector reform and restructur
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Transmission, Distribution, and Disaster Reconstruction Project's main development objectives are to: a) strengthen the high voltage transmission network in Vietnam to facilitate the evacuation of power from generating stations to the loan centers; b) rehabilitate and expand distribution systems to meet demand, reduce losses and improve relativity; c) support power sector reform and restructuring; and d) support institutional strengthening and commercialization. The disaster component was added after typhoon Linda with the objective to help normalize economic activity in the typhoon affected areas through the reconstruction of the electricity distribution network in such areas. The project contains two distinct components. The Transmission and Distribution Component will: construct transmission lines and substations; expand certain substations; rehabilitate distribution networks; and provide consulting services and demand side management. The Disaster Reconstruction Component consists of reconstruction of low and medium voltage lines, as well as distribution transformer substations damaged by typhoon Linda. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
