logo

Transmission Efficiency Project (TEP)

Sector: Power Transmission • Location: Viet Nam

Source: World Bank

Project
Closed

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. The project comprises of three components. The first component, enhancing transmission infrastructure will finance transmission lines and

Project Information FAQ

Project Information

5 Q
The project “Transmission Efficiency Project (TEP)” is an infrastructure initiative in the Power Transmission sector, located in Viet Nam. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. The project comprises of three components. The first component, enhancing transmission infrastructure will finance transmission lines and substations at voltage levels of 220 kilovolt (kV) and 500 kV. The component will roughly finance 15 percent of Vietnam's transmission network growth during the period 2015-2020 by targeting key investment needs in major areas of economic development and where transmission overloads are already present or will happen in the very short term given continuous demand growth. The second component, developing smart grid network will support modernization of monitoring, control, and protection equipment in 500 kV and 220 kV substations to improve the reliability of the interconnected power system as a whole and of some bulk-supply points in the distribution network. The third component, capacity building will contribute to the gradual development of national power transmission company (NPT) to become an independent transmission company with revenues from the application of performance-based regulation in the transmission sector and support the efficient implementation of the overall power sector reform.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data