Transmission Efficiency Project (TEP)
Closed · Viet Nam
Source: World Bank
The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. The project comprises of three components. The first component, enhancing transmission infrastructure will finance transmission lines and
- Status
- Closed
- Sector
- Power Transmission, Forest Products and Packaging, Commercial, Government, Power Generation (CCGT)
- Location
- Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Transmission Efficiency Project (TEP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Transmission Efficiency Project for Vietnam is to improve the capacity, efficiency, and reliability of electricity transmission services in selected parts of the electricity transmission network in the territory of the Borrower. The project comprises of three components. The first component, enhancing transmission infrastructure will finance transmission lines and substations at voltage levels of 220 kilovolt (kV) and 500 kV. The component will roughly finance 15 percent of Vietnam's transmission network growth during the period 2015-2020 by targeting key investment needs in major areas of economic development and where transmission overloads are already present or will happen in the very short term given continuous demand growth. The second component, developing smart grid network will support modernization of monitoring, control, and protection equipment in 500 kV and 220 kV substations to improve the reliability of the interconnected power system as a whole and of some bulk-supply points in the distribution network. The third component, capacity building will contribute to the gradual development of national power transmission company (NPT) to become an independent transmission company with revenues from the application of performance-based regulation in the transmission sector and support the efficient implementation of the overall power sector reform. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Vietnam |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Forest Products and Packaging, Commercial, Government, Power Generation (CCGT) |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Viet Nam
- Viet Nam: Supporting green and blue infrastructure development and capital market in Viet Nam
- Viet Nam: Supporting infrastructure development and climate financing in Viet Nam with second facility with VPBank
- Ultra-High Voltage Transmission Network
- Utility Management of Industrial Parks and Water Supply Project- Sub-Project 2: Utility Management of Phu An Thanh IP
- Utility Management of Industrial Parks and Water Supply Project- Sub-Project 3: Water Supply to Ben Luc District
- Project for Disaster and Climate Change Countermeasures Using Earth Observation Satellite
- Second Program 135 Phase 2 Support
- POWER DEVELOPMENT