Transmission Expansion and Energy Storage Project
Sector: Energy Storage • Location: Namibia
Source: World Bank
The proposed Project will address key priorities in Namibia’s energy sector. The Project Development Objective (PDO) is to strengthen the transmission network, maintain grid stability, and facilitate uptake of renewable energy generation. The Project will finance the construction of a new transmission line and associated substations to strengthen NamPower’s transmission network and to increase cap
- Status
- Prospective
- Sector
- Energy Storage, Power Transmission, Power Generation (CCGT), Government, Commercial
- Location
- Namibia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Transmission Expansion and Energy Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed Project will address key priorities in Namibia’s energy sector. The Project Development Objective (PDO) is to strengthen the transmission network, maintain grid stability, and facilitate uptake of renewable energy generation. The Project will finance the construction of a new transmission line and associated substations to strengthen NamPower’s transmission network and to increase capacity to supply new load and to wheel additional renewable power through the NamPower network. The Project will also finance the development of the second utility scale Battery Energy Storage System (BESS) in the country that will facilitate the uptake of renewable energy generation while maintaining grid stability. The Project will also provide technical assistance (TA) for technical studies, transaction advisory, RE park infrastructure studies, and institutional capacity building. The proposed Project is structured around three components: (i) development of the Auas-Kokerboom Transmission Line (USD 100 million); and (ii) development of a utility scale BESS facility (USD 35 million); and (iii) technical assistance (USD 3.5 million) as set out in further detail in the PCN. Total project funding amounts USD 138.50 and the Project will combine a proposed IBRD loan and a proposed grant from the IBRD Fund for Innovative Global Public Goods (GPGs) Solutions (the “GPG Fund”), a proposed loan from the Green Climate Fund (“GCF”), and a proposed grant from the GCF. The GPG fund proceeds and the GCF loan will be used for developing the BESS facility to facilitate incorporation of large-scale renewable energy in Namibia’s generation mix and to mitigate the high investment cost of pioneer BESS projects in the country. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Namibia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Transmission, Power Generation (CCGT), Government, Commercial |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Namibia
- Karibib Solar Plant
- 3GW Green Hydrogen and Ammonia Project in Namibia
- Namibia's First Green Hydrogen Facility
- Namibia Green Ammonia Project
- Lithium Extraction and Battery Value Chain Project in Namibia
- Construction of 85 MW solar PV plant combined with electrolysers
- Cleanergy Solutions Namibia Green Hydrogen Project
- Cleanergy Solutions Namibia Green Hydrogen Project
