logo

Transmission Grid Enhancement & Modernization Project

Sector: Power Transmission • Location: Bangladesh

Source: World Bank Group

Project
Dropped

The proposed project is A continuation of Bank’s support to the Power Grid Company of Bangladesh (PGCB) to improve the reliability of the backbone transmission network, enable increased share of renewable energy generation in the energy mix, facilitate regional transmission interconnectivity and increased power trade, and modernize grid operations and maintenance practices by integrating digital

Project Information FAQ

Project Information

5 Q
The project “Transmission Grid Enhancement & Modernization Project” is an infrastructure initiative in the Power Transmission sector, located in Bangladesh. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is A continuation of Bank’s support to the Power Grid Company of Bangladesh (PGCB) to improve the reliability of the backbone transmission network, enable increased share of renewable energy generation in the energy mix, facilitate regional transmission interconnectivity and increased power trade, and modernize grid operations and maintenance practices by integrating digital platforms. The project aims to develop new high voltage backbone power transmission infrastructure (230kV and 400kV transmission lines and substations) and to upgrade existing transmission infrastructure to strengthen the capacity of the transmission grid to meet the growing power demand in Bangladesh. The proposed project investments will incorporate flexible and adaptive climate proof designs and operation/maintenance approaches. To ensures sustainability of these interventions, the project will provide technical assistance to to the beneficiary government agencies to strengthen their capacity related to climate resilience. The proposed project investments are largely distributed across the Southern, Central, and Northern regions of the country. With the increase in backbone transmission grid capacity and the availability of modern monitoring and control systems, electricity supply reliability will improve and the system will respond more effectively and flexibly to climate events and the growing demand. Further, supply security will improve due to the expected increase in regional interconnectivity/power trade and increased connection of domestic renewable energy power generation. Consequently, more private sector finance will be expected to flow into the sector to fund these renewable energy projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data