Transmission Line Construction
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge USA
Installing NSBU provided materials to rebuild the approximately 2.5 miles of the Field Street Transmission Line such that the newly installed infrastructure can be energized and operational by March 21, 2025.
- Status
- Closed
- Sector
- Government, Commercial, Road, Power Generation (CCGT), Power Transmission
- Location
- New Smyrna Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Transmission Line Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installing NSBU provided materials to rebuild the approximately 2.5 miles of the Field Street Transmission Line such that the newly installed infrastructure can be energized and operational by March 21, 2025. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | New Smyrna Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Road, Power Generation (CCGT), Power Transmission |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project