logo
ProjectClosed

Transmission Line Project

Sector: Government • Location: Hurricane, Utah, United States of America

Source: Dodge

The City of Hurricane reserves the right to not award the project to the low bidder. Project will consist of the construction of approximately 3,370 feet of 18 transmission line with associated piping and appurtenances connecting to the future Sky Ranch Area 2 million-gallon tank.

Status
Closed
Sector
Government, Commercial, Power Transmission, Power Generation (CCGT)
Location
Hurricane, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Transmission Line Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Transmission Line Project” is an infrastructure initiative in the Government sector, located in Hurricane, Utah, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Hurricane reserves the right to not award the project to the low bidder. Project will consist of the construction of approximately 3,370 feet of 18 transmission line with associated piping and appurtenances connecting to the future Sky Ranch Area 2 million-gallon tank.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Hurricane

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Power Transmission, Power Generation (CCGT)

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project