Transmission Line Rebuild
Sector: Power Generation (CCGT) • Location: Regina, Saskatchewan, Canada
Source: Dodge USA
This project is required to maintain acceptable reliability on the B1A-ALD 72kV transmission line. The existing transmission line is approximately 16km in length and was originally built in 1958 using SaskPower s D01 (D14) structure series. The line is currently comprised of approximately 104 structures.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project is required to maintain acceptable reliability on the B1A-ALD 72kV transmission line. The existing transmission line is approximately 16km in length and was originally built in 1958 using SaskPower s D01 (D14) structure series. The line is currently comprised of approximately 104 structures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
