logo
ProjectCompleted

Transmission Line Replacement in Aroostook County

Completed · Maine · Last reported Dec 2024

Source: The Business Download

Versant Power replaced six miles of transmission line and equipment between Van Buren and Hamlin in Aroostook County. The project involved installing 130 taller poles to support heavier and more resilient cross arms and wire, improving reliability and land clearance for farmers.

Status
Closed
Sector
Power Generation (CCGT)
Location
Maine, United States of America
Updated
22 Jul 2026
Source
The Business Download

ConstructChat

Ask ConstructChat about Transmission Line Replacement in Aroostook County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Transmission Line Replacement in Aroostook County” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maine, United States. Taiyo aggregates data on it from The Business Download.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Versant Power replaced six miles of transmission line and equipment between Van Buren and Hamlin in Aroostook County. The project involved installing 130 taller poles to support heavier and more resilient cross arms and wire, improving reliability and land clearance for farmers.

Original sector

Energy

Location

Country

United States of America (USA)

State

Maine

Source

Source

The Business Download

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project