Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited]
Sector: Hydro • Location: Kishtwar, Jammu and Kashmir, India
Source: India Investment Grid (IIG)
Information Sterlite Power has come up with Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited] with a ticket size of 393 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Chenab Valley Power
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Sterlite Power has come up with Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited] with a ticket size of 393 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Chenab Valley Power Projects Limited [CVPPL] is implementing three Hydro Electric Projects [HEP] viz Pakaldul [1000MW], Kiru [624 MW] and Kwar [540 MW] in J&K. In the 1stNorthern Region Power Committee- Transmission Planning [NRPC [TP]] meeting held on 24/01/2020, Comprehensive system for connectivity was agreed for evacuation of power from Pakaldul [1000MW], Kiru [624 MW] and Kwar [540 MW] HEPs of CVPPL. It was also agreed that the above projects would be connected to a common pooling station through 400kV dedicated transmission line to be implemented by developer of these projects. Further, establishment of common pooling station at Kishtwar by LILO of one circuit of Kishenpur - Dulhasti 400kV D/c [Quad] line [Single Circuit Strung] was also agreed to be implemented under ISTS to provide connectivity to above projects. Subsequently, during 2nd meeting of NRPC [TP] held on 01/09/2020, transmission System was also agreed for transfer of 1000MW from Pakaldul HEP to NR on target region on Long-term Access [LTA] basis. Above Transmission system for evacuation of Power from Pakaldul HEP in Chenab valley was also agreed in 48th Northern Region Power Committee [NRPC] meeting held on 02/09/2020 & 3rd National Committee on Transmission [NCT] held on 26th and 28th May, 2020. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |