logo

Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited]

Sector: Hydro • Location: Kishtwar, Jammu and Kashmir, India

Source: India Investment Grid (IIG)

Project
Closed

Information Sterlite Power has come up with Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited] with a ticket size of 393 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Chenab Valley Power

Project Information FAQ

Project Information

5 Q
The project “Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited]” is an infrastructure initiative in the Hydro sector, located in Kishtwar, Jammu and Kashmir, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Sterlite Power has come up with Transmission System for evacuation of power from pakaldul HEP in Chenab Valley HEPs- Connectivity System [SPV Name- Kishtwar Transmission Limited] with a ticket size of 393 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Chenab Valley Power Projects Limited [CVPPL] is implementing three Hydro Electric Projects [HEP] viz Pakaldul [1000MW], Kiru [624 MW] and Kwar [540 MW] in J&K. In the 1stNorthern Region Power Committee- Transmission Planning [NRPC [TP]] meeting held on 24/01/2020, Comprehensive system for connectivity was agreed for evacuation of power from Pakaldul [1000MW], Kiru [624 MW] and Kwar [540 MW] HEPs of CVPPL. It was also agreed that the above projects would be connected to a common pooling station through 400kV dedicated transmission line to be implemented by developer of these projects. Further, establishment of common pooling station at Kishtwar by LILO of one circuit of Kishenpur - Dulhasti 400kV D/c [Quad] line [Single Circuit Strung] was also agreed to be implemented under ISTS to provide connectivity to above projects. Subsequently, during 2nd meeting of NRPC [TP] held on 01/09/2020, transmission System was also agreed for transfer of 1000MW from Pakaldul HEP to NR on target region on Long-term Access [LTA] basis. Above Transmission system for evacuation of Power from Pakaldul HEP in Chenab valley was also agreed in 48th Northern Region Power Committee [NRPC] meeting held on 02/09/2020 & 3rd National Committee on Transmission [NCT] held on 26th and 28th May, 2020.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data