Transmission system for evacuation of power from Rajasthan REZ Ph-IV Part-1 Bikaner Complex PART-B
Sector: Power Transmission • Location: Gurugram, Haryana, India
Source: India Investment Grid (IIG)
Information Neemrana II Kotputli Transmission Limited, is a subsidiary of Sterlite Power Transmission Limited is implementing 'Transmission system for evacuation of power from Rajasthan REZ Ph-IV [Part-1] [Bikaner Complex]: PART-B' in the states of Rajasthan & Haryana. The project scheme is of National importance as it would be facilitating evacuation of a part of 7.7 GW of clean energy from rene
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | not applicable |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Neemrana II Kotputli Transmission Limited, is a subsidiary of Sterlite Power Transmission Limited is implementing 'Transmission system for evacuation of power from Rajasthan REZ Ph-IV [Part-1] [Bikaner Complex]: PART-B' in the states of Rajasthan & Haryana. The project scheme is of National importance as it would be facilitating evacuation of a part of 7.7 GW of clean energy from renewable energy parks in Rajasthan and would further strengthen the ISTS system. Economic/Social Impact of the Project Renewable Energy Zones were identified by MNRE/SECI with a total capacity of 181.5 GW for likely benefits by the year 2030 in eight states. This includes 75 GW REZ potential in Rajasthan comprising of 15 GW Wind and 60 GW Solar. In this regard, a Comprehensive transmission scheme for evacuation of 75GW RE potential from Rajasthan is already evolved. which includes transmission scheme for total evacuation requirement of 7.7GW from Bikaner Complex i.e Bikaner-II: 3.7 GW, Bikaner-III : 4 GW. As part of comprehensive system, 765/400/220kV Bikaner -III & 765/400kV Neemrana- II Substations are to be established along with interconnections of Bikaner-III PS with Bikaner-PG/ Bikaner-II PS through 400kV lines. For further dispersal of power from Bikaner-III PS, 765kV high-capacity corridor i.e. Bikaner-III-Neemrana-II -Bareilly-PG as well as 400kV interconnections with Gurgaon-PG, Sohna Road and Kotputli is also being implemented. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
