logo

Transmission System for evacuation of power from RE Projects in Osmanabad area [1 GW] in Maharashtra

Sector: Nuclear • Location: Osmanabad, Maharashtra, India

Source: India Investment Grid (IIG)

Project
Closed

Information Indigrid has come up with Transmission System for evacuation of power from RE Projects in Osmanabad area [1 GW] in Maharashtra with a ticket size of 282 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project Govt. of Ind

Project Information FAQ

Project Information

5 Q
The project “Transmission System for evacuation of power from RE Projects in Osmanabad area [1 GW] in Maharashtra” is an infrastructure initiative in the Nuclear sector, located in Osmanabad, Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Indigrid has come up with Transmission System for evacuation of power from RE Projects in Osmanabad area [1 GW] in Maharashtra with a ticket size of 282 INR Crores. This project in Electricity Transmission sub-sector involves The current status of the project is Work Start - Appointed Date and is being developed through the PPP route. Economic/Social Impact of the Project Govt. of India has set a target for establishing 175 GW renewable capacity by 2022 which includes 100 GW Solar, 60 GW Wind generation capacity. MNRE vide its order dated 08.06.2018 had constituted a Sub-Committee to identify ISTS connectivity for renewable energy projects from potential solar energy zones [SEZs] and potential wind energy zones [WEZs] of about 50 GW and 16.5 GW respectively. Accordingly, SEZs and WEZs envisaged in 7 RE rich states [Tamil Nadu, Andhra Pradesh, Karnataka, Gujarat, Rajasthan, Maharashtra and Madhya Pradesh] were identified by SECI in association with MNRE in consultation with RE power developers. A total of 28 GW RE capacity has been identified in Western Region out of which 2 GW Wind generation capacity has been identified in Osmanabad area in Maharashtra. Out of this, 1 GW has been proposed to be integrated with Intra-state system and the balance 1 GW with ISTS. Transmission System for Renewable Energy Zones [REZs] in Western Region [including Osmanabad Wind energy zone[WEZ]] was finalised in the 2nd WRSCT meeting held on 21.05.2019. The subject scheme will enable integration of 1 GW WEZ in Osmanabad area with the ISTS grid. The details of transmission planned specifically for Osmanabad WEZ is depicted below- a] Establishment of 2x500MVA, 400/220kV near Kallam PS b] 1x125MVAr bus reactor at Kallam PS c] LILO of both circuits of Parli[PG] - Pune[GIS] 400kV D/c line at Kallam PS d] Provision of new 50MVAr switchable line reactor at Kallam PS end of Kallam - Pune[GIS] 400kV D/c line e] Conversion of 50MVAr fixed Line Reactors on each ckt pf Parli [PG] - Pune [GIS] 400kV D/c line at Parli [PG] end into switchable line reactors

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data