Transmission system for evacuation of power from REZ in Rajasthan (20 GW) under Phase-III Part I
The owner, status and timeline of this project. A free account opens every field.
Source: Upstox
Adani Energy Solutions has secured a ₹25,000 crore power transmission project, which includes the establishment of a 6,000 MW HVDC system between Bhadla and Fatehpur. This project aims to evacuate renewable energy from Rajasthan to demand centers in North India and the national grid.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Upstox
ConstructChat
Ask ConstructChat about Transmission system for evacuation of power from REZ in Rajasthan (20 GW) under Phase-III Part I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Adani Energy Solutions has secured a ₹25,000 crore power transmission project, which includes the establishment of a 6,000 MW HVDC system between Bhadla and Fatehpur. This project aims to evacuate renewable energy from Rajasthan to demand centers in North India and the national grid. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Rajasthan |
Source
Source | Upstox |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
