Transmission System for Integration of Krishnagiri REZ Phase-I
Sector: Power Generation (CCGT) • Location: Andhra Pradesh, Telangana, Karnataka, India
Source: PSU Watch
The project involves establishing the Inter-State Transmission System (ISTS) for integrating renewable energy generated under the Krishnagiri Renewable Energy Zone (REZ) Phase-I into the national grid. It includes setting up two new 765/400 kV substations in Andhra Pradesh and constructing 765 kV and 400 kV transmission lines traversing Andhra Pradesh, Telangana, and Karnataka, along with associat
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Andhra Pradesh, Telangana, Karnataka, India
- Updated
- 22 Jul 2026
- Source
- PSU Watch
ConstructChat
Ask ConstructChat about Transmission System for Integration of Krishnagiri REZ Phase-I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves establishing the Inter-State Transmission System (ISTS) for integrating renewable energy generated under the Krishnagiri Renewable Energy Zone (REZ) Phase-I into the national grid. It includes setting up two new 765/400 kV substations in Andhra Pradesh and constructing 765 kV and 400 kV transmission lines traversing Andhra Pradesh, Telangana, and Karnataka, along with associated bays. The project will be implemented on a Build, Own, Operate and Transfer (BOOT) basis. |
Original sector | Energy |
Location
Country | India |
State | Andhra Pradesh, Telangana, Karnataka |
Source
Source | PSU Watch |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-07-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
